13F, Orange Planet Bldg., 217, Teheran-ro, Gangnam-gu, Korea webmaster@ltsambo.co.kr
 Contact us  Sinagpore  KOREAN
LT SAMBO
  • HOME
  • Company
    • CEO Greetings
    • Management Philosophy
    • Vision
    • Management Policy
    • Management System
    • Company History
    • Contact us
  • Business
    • Diaphragm Wall
    • Cast-In-Place Pile
    • Marine Work
    • Tunnel
    • Road/Railway Work
    • Plant Civil Enabling Works
    • Earth Work/ Ground Improvement
    • Architecture
    • Institute of Technology
  • Accomplishment
    • Yearly accomplishment
  • HR Recruitment
    • Recruitment Information
    • Recruitment Q&A
  • PR Center
    • LT SAMBO NEWS
    • PR DATA
    • Clients Registration
    • Global network
    • Affiliates
  • Customer Center
    • Q&A
    • Cyber appeal

 Contact us

 Sinagpore

 KOREAN

LT SAMBO
    • Current Page
  1. Home
  2. Business
  3. Diaphragm Wall
  4. Business Introduction
Diaphragm Wall
  • Business Introduction
  • Owned equipment

Since 1987, LT SAMBO has constructed underground continuous walls (Diaphragm wall) for various buildings, dams, subways, plants and special objects. Based on its technical expertise and various experiences, LT SAMBO started its overseas business in Singapore in 1996 and expended its business fields to the world including Vietnam, Hong kong, other southeast asia and middle-east area (UAE-Dubai & Abu Dhabi, Kuwait, Saudi Arabia and Qatar) Which has got a global competitiveness in the area of underground continuous wall (Diaphragm wall).

Introduction of construction method

The underground continuous wall (Diaphragm wall) method uses "BUCKET" and "TRENCH CUTTER" to excavate the ground and After supplying the stabilizing liquid to maintain the wall of drilled hole, it is excavated to a predetermined depth, and Inserting fabricated rebar cage and concrete pouring are repeated to form continuous reinforced concrete walls in the ground. The underground continuous wall (Diaphragm wall) is mainly constructed as the main wall of the underground structure, but sometimes it can also serve as a temporary earth shielding wall during earthworks.

key features
  • Compared with other construction methods, it is suitable for downtown construction due to low noise and vibration.
  • It is suitable for large scale, high depth (100m or more) construction due to good waterproofing and high rigidity of the wall.
    It is possible to prevent settlement affecting surrounding ground or structure, without any variation of wall
  • Wall composition of various thickness is possible, and it is possible to make full use of underground space by cross-sectional construction such as square and circle depending on the application
  • It is possible to construct in most grounds from the soft silt layer to the rock, and the excellent verticality of the wall makes quality control easy
삼보E&C
삼보E&C
Type of construction method

Barrette(Strip pile) method

Introduction

BARRETTE foundation is a type of concrete pier foundation which is installed in the ground basically in rectangular shape and is a method of constructing foundation pile by excavating with underground continuous wall(Diaphragm wall) construction equipment.
The cross-sectional area of the foundation pile can be enlarged to resist vertical and horizontal loads and can be constructed to depths of 80m or more. Depending on the geological conditions, One BARRETTE can replace several cast-in-place piles and driving piles and It is more efficient than circular foundation and is widely adopted in large -scale architecture construction and TOP-DOWN work.

characteristics
  • Not subject to soil conditions, groundwater, depth, etc.
  • Low noise and vibration due to the ground excavation type
  • BARRETTE's planar shape (+, ㅜ, etc.) can be varied
  • One BARRETTE can replace multiple cast-in-place piles and driving piles, which is advantageous for construction cost and period.

TOP-DOWN method

introduction

It means the construction method starting from the top to the bottom when constructing the structure. Generally, the order of constructing the structure is to excavate the soil up to the depth of the underground structure and form the upper structure in turn after the foundation is installed. However, The TOP -DOWN method is first, to construct the underground column and outer wall earth shielding of the structure, and second, to complete a underground foundation structure (bottom plate, beam, etc.), and third, to excavate the underground soil, and fourth, to complete the structure.
The lower structure is gradually completed, and at the same time, the structure of the upper part is also accompanied.

characteristics
  • There is no need to support the wall of the earth shielding.
  • Minimization of civil complaints caused by dust, noise, and vibration, which might be generated during executing earthworks.
  • Construction period can be shortened by constructing aboveground and underground works simultaneously after installation of underground columns.
  • Internal work is possible even during rainy season.
Accomplishment
pageview
View

SongDo C8-1BL living accommodation Constructions

Diaphragm Wall
  • Korea
  • 2020
  • Construction period
  • 2020.09 ~ 2021.12
  • The Employer/ Client
  • Korea Asset Development Corporation
  • The Main Contractor
  • Hyundai Engineering & Construction Co., Ltd
  • Project outline
  • Diaphragm wall + PRD + PHC and so on
pageview
View

Bujeon~Masan Track Railway Restoration Project(Diaphragm wall)

Diaphragm Wall
  • Korea
  • 2020
  • Construction period
  • 2020.06 ~ 2021.04
  • The Employer/ Client
  • SMARTRAIL Corporation
  • The Main Contractor
  • SK Engineering & Construction Co.,Ltd
  • Project outline
  • Diaphragm wall
pageview
View

The Bank Of Korea Consolidated Annex Construction

Diaphragm Wall
  • Korea
  • 2019
  • Construction period
  • 2019.09 ~ 2022.03
  • The Employer/ Client
  • Public Procurement Service
  • The Main Contractor
  • Kyeryong Construction & Industrial Co., Ltd.
  • Project outline
  • Diaphragm Wall
pageview
View

Magok LG Science park

Diaphragm Wall
  • Korea
  • 2014
  • Construction period
  • 2014.08 ~ 2017.03
  • The Employer/ Client
  • LG Consortium
  • The Main Contractor
  • SAMBO E&C
  • Project outline
  • Industrial Plant
View All
  • assessmentLT SAMBO NEWS
  • ● Order announcement(Godeok Xi centro Constructions, Korea)


    1. Project : Godeok Xi centro Constructions

    2. Client : Pyeongtaek City Corp.

    3. Main Contractor :  GS Engineering & Construction Corp.

    4. Construction Feature : H-PILE + SGR + Earthwork and so on.
    alarm Mar 7, 2023

    View all
  • videocamVideo Profile
  • ● Three-Runway System


    LT 삼보
    alarm Jul 6, 2017

    View all
  
LT SAMBO
Latest News
  • Order announcement(Godeok Xi centro Constructions, Korea)
  • Order announcement(C3804 - East Fire Station, HONGKONG)
  • Order announcement(e-Convenient City Pyeongtaek Goduk, Korea)
  • Order announcement(Reclamation and site construction of offshore port lighters wharf(Korea)
  • Order announcement(Project for Preventing Urban Water Sewage from Yeonsucheon Basin in Sewerage Maintenance Area, Korea)
Contact Us
  • 13F, Orange Planet Bldg., 217, Teheran-ro, Gangnam-gu, Seoul, Republic of Korea
  • 02-3480-9500
  • 02--532-0577
  • webmaster@ltsambo.co.kr
    • LT Metal Ltd
    • LT Precision Ltd
    • LT Material Ltd

SITE MAP
© Copyright 2017 - LT SAMBO
All right reserved